Saturday, 15 February 2014

blog entry 2 - Prologue!


-          For next 5 weeks, the production team will be designing and creating a film and video game. These 2 different mediums will illustrate the production pipeline and its working methods. The creation of this film and game is an exercise to prepare the production team for the official project starting 5 weeks from now.
-          The film shown to the students was an animatic produced by the design team, the production’s team task is to create a final film and Game which will be shown at the end of the 5th week. In the film Brunhilda is used as an example to help illustrate how a project is managed and completed by the team.
-          The production team is made up of six different smaller team working together to create this final product, this teams include:
-          Modellers
-          Riggers
-          Animators
-          Programmers
-          Technical artists
-          Level designers

My role as 2D artist will require myself to work closely with the design team and Modelling team. For the next 5 weeks I will be producing 2D assets such as Character and environment concepts, 2D textures and reporting to the design team for more tasks.


This week I worked with two 2D artists generating character concepts and reference sheets for Brunhilda and character who will represent each role in the production and design team.




No comments:

Post a Comment